Cold aisle containment with an active roof, installed during live operation
Cross-Guard installed a cold aisle containment system with an active roof across three enclosures for a datacentre provider while the hall remained in live operation.
Infill panels raised the roof to clear overhead services and the system was assembled without drilling or cutting. The operator reported that PUE improved from 1.85 to 1.55, with projected annual savings above £118,500.
What was supplied
- Cold aisle containment with active roof panels
- Infill panels to clear overhead services
- Installation in a live data hall
Source: cross-guard.com case studies (Digital Realty).